top of page
Pipe Machining and Cutting

Installation of 1,735' of 8" PVC water main with two fire hydrants, pipe bedding, removal and recompact gravel, fire hydrant flow testing, hydrostatic testing, pressure testing, bacteria testing, and concrete valve blocks. Installed 975 lf of 8" PVC sewer main, tied into existing sewer, installed five 4" manholes, after completion completed jet ball and television mainline and pressure test.  Installed 4,800 lf of 4" HDPE pipe for communication wiring. Trenched 2,340 lf for pipe installation and bore the emaining linear feet of pipe. Installed fiber and 25 pair copper wire, fuse new pipe, installed 4x7 electrical vault with hatch, 200 amp 4-way modules, electric concrete duct bank, pulled fiber  & copper wire and completed testing.

Pinon Canyon Utilities Extension > USACE Fort Carson, CO

Utilities: Testimonial
Pipe Machining and Cutting

Installation of precast Utility water treatment facility building including electrical panels, pump controls, pressure regulation valves, chlorine tanks and pumps. Removed and replaced cistern and installed concrete foundation. Excavation was completed in rocky conditions and work was subject to delays due to heavier than anticipated snow, sit access, and owner equipment changes.

US Forest Service - White Star Campground > PIke San Isabel National Forest District, Pueblo, CO

Utilities: Testimonial
Electrical Inspectors

Complete Design/Build of new three phase oil-filled, load tap changing transformers and power circuit breakers.

Substation / Electrical Distribution > Fort Carson, CO

Utilities: Testimonial
bottom of page